You wouldn't buy a car without test-driving it, right? We feel the same way about red light therapy panels. They need to be proven.
REDDOT employs a comprehensive suite of testing and aging equipments to ensure every red light therapy panel meets our stringent quality and performance standards. This includes power meters, electronic loads, transformers, and specialized aging racks.
Testing area with various equipment, including power meters, electronic loads, transformers, and aging racks
I've seen panels fail prematurely because they weren't properly tested. Let me show you how we make sure that doesn't happen at REDDOT.
"Trust, but verify," as the saying goes. We don't just assume our panels work; we prove it.
Before leaving our facility, each red light therapy panel undergoes a series of rigorous tests using specialized equipment. This ensures that every component functions correctly and that the panel delivers the expected performance.
A technician using a power meter to measure the output of a red light therapy panel
We don't just want our panels to work today. We want them to work for years.
After initial testing, panels are placed on aging racks for an extended period. This "burn-in" process simulates long-term use, identifying any potential weaknesses or premature failures before the product reaches the customer.
A view of the aging racks, with multiple red light therapy panels undergoing continuous operation
Equipment | Purpose | Measurement | Pass/Fail Criteria |
---|---|---|---|
Power Meter | Measures the electrical power input to the panel. | Watts (W) | Must be within the specified range (e.g., ±5% of the rated power). |
Electronic Load | Simulates different usage scenarios, drawing varying amounts of current from the panel. | Amps (A), Volts (V) | Panel must maintain stable voltage and current output under different load conditions. |
Transformer | Provides the correct voltage and current to the panel. | Volts (V), Amps (A) | Output voltage and current must match the panel's specifications. |
Aging Rack | Runs the panel continuously for an extended period to test its durability and identify potential issues. | Hours of operation | Panel must operate without failure for the specified duration (e.g., 24-72 hours). |
Visual inspection | Technicians to check components. | Cracks, Loose components. | Must not have physical defects that could affect safety. |
REDDOT's comprehensive testing and aging procedures are crucial. We're committed to providing products, that you will be able to use for a long time.